{"id":10877,"date":"2026-03-16T23:14:26","date_gmt":"2026-03-16T20:14:26","guid":{"rendered":"https:\/\/csc-ksa.com\/?p=10877"},"modified":"2026-03-16T23:14:28","modified_gmt":"2026-03-16T20:14:28","slug":"project-delivery-taif","status":"publish","type":"post","link":"https:\/\/csc-ksa.com\/en\/project-delivery-taif\/","title":{"rendered":"Assaf Project Delivery Taif \u2013 Jouri Mall Branch"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-1024x768.jpeg\" alt=\"Project Delivery Taif\" class=\"wp-image-10878\" title=\"\" srcset=\"https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-1024x768.jpeg 1024w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-300x225.jpeg 300w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-768x576.jpeg 768w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-1536x1152.jpeg 1536w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-460x345.jpeg 460w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption><\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">1. Project Delivery Taif &#8211; Sustaining Strategic Partnerships and Mutual Trust in Taif<\/h3>\n\n\n\n<p>As part of our ongoing fruitful collaboration with the prestigious &#8220;<a href=\"https:\/\/3saf.com\/\" target=\"_blank\" rel=\"noopener\">Assaf<\/a>&#8221; brand, <strong>Construction Services Co. Ltd.<\/strong> is proud to announce the successful completion and delivery of the new Assaf branch in <strong>Jouri Mall, Taif<\/strong>. This project marks a significant milestone in our series of shared successes, reflecting the trust that major brands place in our capabilities as a leading <strong>contracting company in Taif<\/strong>, committed to delivering engineering standards that exceed expectations.<\/p>\n\n\n\n<p>Our selection to execute this branch in the heart of Taif is more than just a contract; it is a testament to the robust professional relationship we have built with &#8220;Assaf,&#8221; founded on an absolute commitment to finishing quality and timely delivery.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Construction Services Co. Ltd. \u2013 Expertise Spanning Across the Kingdom<\/h3>\n\n\n\n<p>Our company is a pioneer in the general contracting sector, possessing extensive experience that makes us the premier choice for anyone seeking a reliable <strong>construction company in Saudi Arabia<\/strong>. We specialize in transforming raw spaces into vibrant commercial hubs. Our services as a <strong>general contractor<\/strong> include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/csc-ksa.com\/en\/finishing-decoration\/\" data-type=\"page\" data-id=\"10041\">Execution of major retail stores<\/a> and commercial showrooms.<\/li>\n\n\n\n<li><a href=\"https:\/\/csc-ksa.com\/en\/finishing-decoration\/\" data-type=\"page\" data-id=\"10041\">Fit-out of restaurants and cafes<\/a> according to international brand identities.<\/li>\n\n\n\n<li><a href=\"https:\/\/csc-ksa.com\/en\/contracting-and-construction\/\" data-type=\"page\" data-id=\"10028\">Construction of medical facilities<\/a>, warehouses, and industrial projects.<\/li>\n\n\n\n<li><a href=\"https:\/\/csc-ksa.com\/en\/finishing-decoration\/\" data-type=\"page\" data-id=\"10041\">Renovation and development of commercial and administrative buildings<\/a>.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">3. Scope of Work Details \u2013 Jouri Mall Branch (Taif)<\/h3>\n\n\n\n<p>As a <strong>construction company in Taif<\/strong> that understands the value of detail, we executed the project on a &#8220;turnkey&#8221; basis, covering:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Civil and Architectural Works:<\/strong> Implementation of partitions and suspended ceilings with high precision to ensure acoustic and aesthetic insulation.<\/li>\n\n\n\n<li><strong>Mechanical, Electrical, and Plumbing (MEP):<\/strong> Installation of specialized lighting networks designed to highlight product quality, integrated with smart control panels.<\/li>\n\n\n\n<li><strong>HVAC Systems:<\/strong> Installation of advanced cooling systems tailored to Taif\u2019s climate, ensuring a comfortable environment for mall visitors.<\/li>\n\n\n\n<li><strong>Final Finishes:<\/strong> Execution of marble flooring and luxury painting that perfectly reflects Assaf\u2019s visual identity.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf-1024x768.jpeg\" alt=\"Project Delivery Taif assaf\" class=\"wp-image-10880\" title=\"\" srcset=\"https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf-1024x768.jpeg 1024w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf-300x225.jpeg 300w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf-768x576.jpeg 768w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf-1536x1152.jpeg 1536w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf-460x345.jpeg 460w, https:\/\/csc-ksa.com\/wp-content\/uploads\/2026\/03\/Project-Delivery-Taif-assaf.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption><\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">4. Execution Phases and Engineering Supervision<\/h3>\n\n\n\n<p>Work at the site proceeded according to a rigorous schedule, with our engineers supervising every phase to ensure quality:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Phase I:<\/strong> Site handover and coordination with Jouri Mall management regarding permits.<\/li>\n\n\n\n<li><strong>Phase II:<\/strong> Execution of MEP foundations and plumbing works.<\/li>\n\n\n\n<li><strong>Phase III:<\/strong> Interior finishes, d\u00e9cor, and exterior storefront execution.<\/li>\n\n\n\n<li><strong>Phase IV:<\/strong> Final testing of safety and fire systems, handing over the site ready for the grand opening.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">5. Contact Us \u2013 Your Construction Partner in Taif<\/h3>\n\n\n\n<p>If you are looking for a <strong>contracting company in Taif<\/strong> with the competence and capacity to execute your commercial project to the highest standards, <strong>Construction Services Co. Ltd.<\/strong> is your trusted destination.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Contact:<\/strong> +966 506109911<\/li>\n\n\n\n<li><strong>Email:<\/strong> info@csc-ksa.com<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. Project Delivery Taif &#8211; Sustaining Strategic Partnerships and Mutual Trust in Taif As part of our ongoing fruitful collaboration with the prestigious &#8220;Assaf&#8221; brand, Construction Services Co. Ltd. is proud to announce the successful completion and delivery of the new Assaf branch in Jouri Mall, Taif. This project marks a significant milestone in our &hellip; <br \/><a href=\"https:\/\/csc-ksa.com\/en\/project-delivery-taif\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Assaf Project Delivery Taif \u2013 Jouri Mall Branch<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":10869,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10877","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1"],"acf":[],"_links":{"self":[{"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/posts\/10877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/comments?post=10877"}],"version-history":[{"count":1,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/posts\/10877\/revisions"}],"predecessor-version":[{"id":10882,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/posts\/10877\/revisions\/10882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/media\/10869"}],"wp:attachment":[{"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/media?parent=10877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/categories?post=10877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csc-ksa.com\/en\/wp-json\/wp\/v2\/tags?post=10877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}