Contractor for implementing and equipping commercial branches and stores
We implement brand branches, stores and restaurants with a rapid timeline and multi-site implementation, with the specification and identity consistent between each branch until ready-to-operate delivery.
We work with companies that open new branches or renew their existing branches and need an implementation contractor who maintains the specifications and identity in each location and adheres to the opening date. We do not target individuals and do not provide independent design services.
Store chains and brands
Restaurants, cafes and food chains
Exhibitions and Commercial Premises
Commencement Requirements
Branch diagrams and visual identity guide
BOQ or written scope of work
File of materials and finishes approved for the sign
Scope of implementation work for branches and stores
Multi-site implementation
Multi-site Rollout
Manage multiple branches with a synchronized schedule.
Finishes
Fit-out
Partitions, ceilings, floors, walls and fixed furniture.
Electromechanics
MEP
Lighting, air conditioning, plumbing and fire alarm.
Panels
Signage
Internal and external paintings according to the identity.
Screen
Facade
Cladding, glass and storefront.
Quick Table
Fast-track Schedule
A compact plan that takes into account the opening date.
Stability of the specification
Consistency
One specification file for all branches.
Delivery
Handover
Feedback processing and turnkey delivery.
Implementation details
Multi-site implementation
Opening several branches at the same time requires unified management, not separate teams. We operate on a simultaneous schedule for each site, with a central supply of approved materials and consolidated completion reports showing where each branch stands against the weekly chart.
Stability of specification and identity
Materials, colours, paintings and operational details are fixed in one specification file applied to each branch, and samples are approved centrally, so that the customer’s experience within the new branch is identical to the existing branches.
Schedule and opening date
The implementation plan is built from the opening date back, identifying the critical path and long-term materials early, and working outside mall or site hours when needed to not lose days from the schedule.
Delivery ready for operation
Before opening, observations are collected and processed, lighting, air conditioning and alarm systems are tested, and the branch is delivered ready for the entry of equipment and inventory and the start of operation.
Have a new branch ready to roll?
Submit the blueprints and bill of quantities for review by the implementation team.
Simultaneous implementation teams in more than one city with one specification and unified completion reports for each branch.
Implementation steps
Five documented stages
01
Receiving documents
Drawings, Specifications and Bill of Quantities.
02
Preparation
Time plan, material approval and site preparation.
03
Implementation
Phased implementation with field coordination and weekly reports.
04
tests
Material and Operating Tests and Receiving Minutes.
05
Delivery
Processing notes and handing over final documents.
Quality and safety
Uniform quality in all branches
The same quality and implementation standards are applied to all branches without variation. Approved materials and operational details are recorded in a single approved specification file for each site, with samples centrally approved and reviewed prior to opening to ensure consistency of experimentation and identity.
With a single specification file for materials and details, central approval of samples, and a review before opening to ensure that the branch complies with the standard.