Gas stations

Contractor for implementing gas stations in Saudi Arabia

We implement gas stations, from earthworks and ground tanks to the canopy, front yard and safety systems, in full compliance with the approved technical requirements and the commercial identity of the operator.

Complete stations

From earthworks to operation

Safety certified

Fire systems, grounding and testing

Commitment to identity

The canopy and flaps are in accordance with the operator's manual

All regions of the Kingdom

Mobile implementation teams

We work with

Station operators and distribution companies And franchisees

We provide integrated implementation services to companies that own or operate gas stations, from implementation to delivery of the station ready for operation. Our services are limited to companies and institutions, and do not include independent design services.
Distribution companies and terminal operators
Business franchisees
Industrial facilities with indoor stations
Transport companies and fleets
Commencement Requirements
Scope of work

Scope of gas station implementation works

SITE WORKS
Site Works
Cleaning, excavation, backfilling and levelling.
Structural and civil works
Structural & Civil
Foundations, concrete and civil works.
Earth Works
Underground Works
Tanks, extensions and tests prior to burial.
CANOPY
Canopy
Chassis, cladding and panels.
In the front yard? !
Forecourt
Flooring, islands, pumps and drainage.
Electromechanics
MEP
Electricity, lighting, earthing and wiring.
: The Safety & Fire fighting.
Fire & Safety
Systems and equipment in accordance with the requirements.
tests
Testing
Tightening and commissioning tests within the project.
Implementation details

Site works and ground works

The station starts from the site itself: cleaning, digging, determining levels, then establishing tanks and extensions. This stage has the greatest impact on the schedule, and therefore it is documented with records and sealing tests before any closure or burial, and the next stage does not occur without documented receipt.

Awning and front yard

The metal structure of the canopy, cladding and panels shall be implemented in accordance with the approved operator’s identification guide. The forecourt includes decks, islands, pump locations and drainage slopes, taking into account vehicular movement and daily operation safety.

Electromechanics and safety systems

Electricity, lighting, grounding, and wiring are implemented in coordination with civil works, and fire-fighting and safety systems are installed and tested in accordance with the approved technical requirements, with a complete test file delivered.

Attached facilities

The store, restrooms, mosque, laundry and maintenance sites are implemented as part of the project when they are present in the plans, with the same level of finish and specifications approved for the station.

Have a station ready to go?
Submit the blueprints and bill of quantities for review by the implementation team.
A
Approved authority for the implementation of gas stations
Implementation is carried out in accordance with the technical requirements approved by the Ministry of Energy and the regulatory authorities and in coordination with the operator.
Implementation steps

Five documented stages

01
Receiving documents
Drawings, Specifications and Bill of Quantities.
02
Preparation
Time plan, material approval and site preparation.
03
Implementation
Phased implementation with field coordination and weekly reports.
04
tests
Tightness, operation and safety tests.
05
Delivery
Processing notes and handing over final documents.
Quality and safety

The gas station is a safety project before it is a construction project

It will be implemented according to an approved safety plan, which includes pressure and sealing tests and complete documentation of each stage before closing
Quality plan for each stage
Safety plan and site supervisor
Tightness and compression tests
Notarized delivery file
Frequently asked questions

Questions about the implementation of gas stations

Yes, the canopy, colors and paintings are implemented in accordance with the operator’s approved identification guide and no modification is made without written approval.

Varies depending on site works and ancillary facilities; The estimated duration is determined after reviewing the drawings and schedule of quantities.

Yes — mosque, restrooms, store, laundry, and maintenance, if within the project scope and plans.

No, it is not possible to limit ourselves to implementing specific items only without committing to the entire project.
No, the company does not design gas stations directly, as this aspect requires specialized operational experience, and therefore a specialized operating partner (Operator) is being sought to cooperate with it specifically within this item.
No, the company is not responsible for operating the station, as our role is limited to contracting and construction work only, and we are not an operating entity. Responsibility for operation lies with the operator

Submit station plans and bill of quantities

Or request a review of project requirements before pricing — info@csc-ksa.com