SASCO station – Taif
Gas stations

SASCO station – Taif

Taif station for SASCO, from infrastructure to landscaping, within five months.

العميل
Saudi Automotive Services and Equipment Company (SASCO)
القطاع
Gas stations
المدينة
Taif
النطاق
Create a complete gas station with infrastructure
الحالة
complete
نبذة عن المشروع

SASCO station - Taif

CSC built SASCO’s Taif station with its infrastructure. The station includes fuel tanks, workshop buildings, a laundry, a supermarket, and a canopy, in addition to a chapel, a management office, staff housing, and electrical and control rooms. The work included finishing, mechanical and electrical works, advertising signs, sidewalks, asphalt, yard planning and landscaping. The project duration is five months, and was completed in 2021.

النطاق المنفّذ

Fuel tanks
Workshop buildings
Car wash
supermarket
Station canopy
Chapel and administration office
Staff housing
Electrical and control rooms
Pavements, asphalt and yard layout
afforestation

أبرز مراحل التنفيذ

Infrastructure and reservoirs

Implementing the station’s infrastructure and installing fuel tanks.

Buildings and canopy

Workshops, laundry, supermarket and canopy, with a prayer room, administration office, staff accommodation and electrical and control rooms.

Electromechanics and finishing

Mechanical and electrical systems, finishes and advertising panels.

Yards and landscaping

Sidewalks, asphalt, yard planning and landscaping.

الجودة والاختبارات
Testing the tightness of tanks and piping networks
Calibration of filling systems
Testing of fire and safety systems
Checking grounding and lightning rod
Testing the layout of the squares and their inclinations

صور المشروع

CSC

اطلب تنفيذ مشروع مشابه

أرسل المخططات وجدول الكميات وسيراجعها فريق التنفيذ.