Heart Center – King Abdullah Medical City, Makkah
Medical facilities

Heart Center – King Abdullah Medical City, Makkah

Equipping the Heart Center at King Abdullah Medical City in Makkah Al-Mukarramah, from operating rooms to the medical gases network, within 11 months.

العميل
CAD Saudi German Construction Company
القطاع
Medical facilities
المدينة
Mecca
النطاق
Equipping a heart center with operating rooms, catheterization and intensive care
الحالة
complete
نبذة عن المشروع

Heart Center - King Abdullah Medical City, Makkah

CSC equipped the Heart Center at King Abdullah Medical City in Makkah Al-Mukarramah for the Saudi German CAD Construction Company, which is one of the largest heart centers in the Middle East. The work included operating rooms, catheterization, recovery, intensive care and medical facilities, and required continuous coordination between engineering and medical teams to meet medical standards. We carried out construction and architectural works, and prepared sites for the installation of medical devices and vital support systems. We supplied and installed sound and thermal insulation, ventilation and air conditioning, fire and bacteria-resistant surfaces, air sterilization systems, surveillance devices, and specialized lighting. The supply and installation also included electrical panels, continuous and backup power, radiation insulation, control systems, oxygen and medical gas distribution, emergency systems, fire alarm and extinguishing, the information network and paging system, and the drainage and water treatment network. The project duration is 11 months, and was completed in 2021.

النطاق المنفّذ

Construction and architectural works
Equipping operating rooms and catheterization
Equipping intensive care and recovery rooms
Preparing medical devices and vital support systems
Sound and thermal insulation
Ventilation, air conditioning and air sterilization
Fire and bacteria resistant surfaces
Specialized lighting and surveillance devices
Continuous and backup power
Radiation isolation
Distribution of oxygen and medical gases
Fire alarm and extinguishing it
Information network and calling system
Sanitation and water treatment

أبرز مراحل التنفيذ

Construction and architectural works

Implementing construction and architectural works for the center’s departments.

Preparing medical rooms

Operating, catheterization, recovery, and intensive care rooms, and preparing them to install vital devices and support systems.

Specialized systems

Acoustic, thermal and radiation insulation, ventilation and air sterilization, and fire and bacteria resistant surfaces.

Energy, gases and networks

Continuous and backup power, oxygen and medical gases, alarm and firefighting, networks and paging system.

الجودة والاختبارات
Testing the medical gas network and its pressures
Balancing the air conditioner and checking room pressure
Surgical and emergency lighting testing
Radiation protection inspection of designated rooms
Testing of alarm and firefighting systems