CSC implemented the administrative offices of the Muslim World League in Jeddah in two phases. In the first phase we undertook the architectural design, complete implementation and supply of office furniture, addressed the engineering site constraints with alternative solutions, and was completed in 2022 within three months. In the second stage, cost control was required, so we studied the details of the project, chose materials and technologies within the budget, and carried out the structural, architectural, and electromechanical works without exceeding them. The second phase was completed in 2023 within three months.
العميل
Muslim World League
القطاع
Finishes
المدينة
grandmother
النطاق
Design, implementation and furnishing of administrative offices in two phases
الحالة
complete
نبذة عن المشروع
Administrative offices in the main building — Muslim World League
النطاق المنفّذ
Architectural design
Complete implementation of offices
Supply of office furniture
Construction works
Architectural works
Electromechanical works
أبرز مراحل التنفيذ
Architectural design
Phase 1: Office design with solutions to engineering site constraints.
Implementation and furnishing
Full implementation and supply of office furniture, and the phase was completed in 2022.
Cost study
The second stage: reviewing project details and selecting materials and techniques within the budget.
Implementation within budget
Structural, architectural and electromechanical works were carried out without exceeding the budget, and were completed in 2023.
الجودة والاختبارات
Testing electrical panels and loads
Balancing air conditioning and ventilation
Testing of alarm and firefighting systems
Inspect plumbing and drain fixtures
Check lighting levels