CSC implemented the administrative offices of the Muslim World League in Jeddah in two phases. In the first phase we undertook the architectural design, complete implementation and supply of office furniture, addressed the engineering site constraints with alternative solutions, and was completed in 2022 within three months. In the second stage, cost control was required, so we studied the details of the project, chose materials and technologies within the budget, and carried out the structural, architectural, and electromechanical works without exceeding them. The second phase was completed in 2023 within three months.
Finishes
Administrative offices in the main building — Muslim World League
Administrative offices of the Muslim World League in Jeddah, in two phases in 2022 and 2023, three months for each phase.
Client
Muslim World League
sector
Finishes
City
Jeddah
Scope
Design, implementation and furnishing of administrative offices in two phases
Status
Completed
Project Overview
Administrative offices in the main building — Muslim World League
Completed Scope
Architectural design
Complete implementation of offices
Supply of office furniture
Construction works
Architectural works
Electromechanical works
Key Construction Stages
Architectural design
Phase 1: Office design with solutions to engineering site constraints.
Implementation and furnishing
Full implementation and supply of office furniture, and the phase was completed in 2022.
Cost study
The second stage: reviewing project details and selecting materials and techniques within the budget.
Implementation within budget
Structural, architectural and electromechanical works were carried out without exceeding the budget, and were completed in 2023.
Quality and Testing
Testing electrical panels and loads
Balancing air conditioning and ventilation
Testing of alarm and firefighting systems
Inspect plumbing and drain fixtures
Check lighting levels