GRC facades of the main building — Muslim World League
General contracting

GRC facades of the main building — Muslim World League

GRC facades with an Islamic character on the existing Muslim World League building in Jeddah, after a complete structural examination, within 10 months.

العميل
Muslim World League
القطاع
General contracting
المدينة
grandmother
النطاق
Cladding of an existing building with GRC facades
الحالة
complete
نبذة عن المشروع

GRC facades of the main building — Muslim World League

CSC proposed cladding the main building of the Muslim World League in Jeddah with GRC facades in a historical Islamic style, to renew the appearance of an old building without demolishing it. Before implementation, we examined the building structure, foundations and walls to ensure their ability to support the weight of the facades. Based on the results, we designed the solution according to the nature of the building, and added a metal structure to support the structure in some parts. During the work, we modified the locations of air conditioners, electrical and plumbing installations, and surveillance and lighting systems. The project duration is 10 months, and was completed in 2021.

النطاق المنفّذ

Engineering examination of the structure, foundations and walls
Facade design according to the existing building
Supportive metal structure
Installation of GRC facades
Modifying air conditioner locations
Modifying electrical and plumbing installations
Surveillance and lighting systems

أبرز مراحل التنفيذ

Engineering examination

Examine the building structure, foundations and walls to ensure their ability to support the facades.

Design and support

Designing the facades according to the nature of the building, and adding a metal structure to support some of its parts.

Installation of GRC facades

Installing GRC panels with an Islamic character on the building facades.

Modify services

Rearranging air conditioners, electrical and plumbing installations, surveillance and lighting systems.

الجودة والاختبارات
Examining the ability of the structure and foundations to carry the facades
Inspect the installation of GRC panels and metal structure
Testing electrical and plumbing installations after modification
Testing of lighting and monitoring systems