The Muslim World League office project in Jeddah began by studying the service provided and the target group of visitors, from which we determined the spaces and their distribution. The design used wood, glass and lighting, with furniture, displays, signage and logos in the association’s identity colours. CSC equipped the office with equipment, furniture, air conditioning and electrical systems, and a waiting and monitoring system, and then trained employees to operate these systems. The project duration is four months, and will be completed in 2022.
العميل
Muslim World League
القطاع
Finishes
المدينة
grandmother
النطاق
Design and equip a visitors reception office
الحالة
complete
نبذة عن المشروع
Jeddah Office - Muslim World League
النطاق المنفّذ
Study the need and space distribution
Wood and glass works
lighting
furniture
Displays, banners and logos
Air conditioning and electricity
Waiting system
Monitoring system
Training employees on systems
أبرز مراحل التنفيذ
Need study
Analyze the service provided and the target group of visitors to determine the spaces.
Design
Wood, glass, lighting and furniture, with displays, signs and logos of the association's identity.
Equipment and systems
Supplying equipment and furniture, installing air conditioning, electricity, and a waiting and monitoring system.
Training and delivery
Training employees to operate the systems before handing over the office.
الجودة والاختبارات
Testing electrical panels and loads
Balancing air conditioning and ventilation
Testing of alarm and firefighting systems
Inspect plumbing and drain fixtures
Check lighting levels