CSC Design won Best Creative Design for the main reception and corridors of the Muslim World League building in Jeddah. The design combined the client’s requirements with a modern and luxurious feel, and we chose materials that suit the nature of the place. We carried out electrical, mechanical, air conditioning, woodwork, electronic and technical systems, displays, marble, lighting and furniture. After this project, the association assigned other projects to CSC. The project duration is four months, and was completed in 2021.
العميل
Muslim World League
القطاع
Finishes
المدينة
grandmother
النطاق
Design and implementation of the main reception and corridors
الحالة
complete
نبذة عن المشروع
Reception and corridors — Muslim World League
النطاق المنفّذ
Design of reception and corridors
Electrical and mechanical works
conditioning
Wooden works
Electronic and technical systems
Display screens
marble
lighting
furniture
أبرز مراحل التنفيذ
Design
Design the reception and corridors, and choose materials that suit the place.
Electromechanical works
Electricity, mechanics and air conditioning.
Wood, marble and technology
Woodwork, marble, electronic systems and displays.
Lighting and furniture
Installing lighting, supplying furniture, and delivering the space ready.
الجودة والاختبارات
Testing electrical panels and loads
Air conditioning balancing
Testing electronic systems and displays
Check lighting levels
صور المشروع