Reception and corridors — Muslim World League
Finishes

Reception and corridors — Muslim World League

CSC won the design for the Muslim World League's main reception in Jeddah, and we then executed it within four months.

Client
Muslim World League
sector
Finishes
City
Jeddah
Scope
Design and implementation of the main reception and corridors
Status
Completed
Project Overview

Reception and corridors — Muslim World League

CSC Design won Best Creative Design for the main reception and corridors of the Muslim World League building in Jeddah. The design combined the client’s requirements with a modern and luxurious feel, and we chose materials that suit the nature of the place. We carried out electrical, mechanical, air conditioning, woodwork, electronic and technical systems, displays, marble, lighting and furniture. After this project, the association assigned other projects to CSC. The project duration is four months, and was completed in 2021.

Completed Scope

Design of reception and corridors
Electrical and mechanical works
conditioning
Wooden works
Electronic and technical systems
Display screens
marble
lighting
furniture

Key Construction Stages

Design

Design the reception and corridors, and choose materials that suit the place.

Electromechanical works

Electricity, mechanics and air conditioning.

Wood, marble and technology

Woodwork, marble, electronic systems and displays.

Lighting and furniture

Installing lighting, supplying furniture, and delivering the space ready.

Quality and Testing
Testing electrical panels and loads
Air conditioning balancing
Testing electronic systems and displays
Check lighting levels