CSC implemented the Al Amal station of the Oman Oil Company (OMCO) in Dammam, from building construction and services to finishing. The site required groundwater dewatering, and we then implemented sewerage, electricity and infrastructure. We installed fuel tanks, fire systems, and floor installations, and completed the finishes in accordance with the terms and regulations of the Ministry of Energy. The project duration is six months, and will be completed in 2024.
العميل
Oman Oil Company (OMCO)
القطاع
Gas stations
المدينة
Dammam
النطاق
Establishing a gas station in accordance with the requirements of the Ministry of Energy
الحالة
complete
نبذة عن المشروع
Hope Station - OMCO, Dammam
النطاق المنفّذ
Station buildings and services
Groundwater dewatering
Sewerage network
Electricity network
Fuel tanks
Fire systems
Floor extensions
Finishes according to the requirements of the Ministry of Energy
أبرز مراحل التنفيذ
Groundwater dewatering
Dewatering the site before starting foundations.
Networks and infrastructure
Sewerage networks, electricity and station infrastructure.
Tanks and fire
Installation of fuel tanks, fire systems and floor extensions.
Buildings and finishes
Construction of the station buildings, services and finishing according to the conditions of the Ministry of Energy.
الجودة والاختبارات
Testing the tightness of tanks and piping networks
Calibration of filling systems
Testing of fire and safety systems
Checking grounding and lightning rod
Testing the layout of the squares and their inclinations