Raydan is one of the largest restaurant and catering companies in the Kingdom. CSC built its factory in Jeddah Industrial City (Modon), and distributed the facilities in the spaces required by machinery and device manufacturers. We implemented roofs that can withstand heavy machinery and equipment, ventilation and air conditioning systems for production and storage areas, and an integrated electrical system with backup generators. We used insulating materials to control heat and humidity, and installed cooling and storage systems for raw materials and finished products. We equipped the water and sanitation network and the production, storage, packaging and distribution areas in accordance with health and safety requirements, and provided the factory with modern firefighting systems. The project duration is nine months, and will be completed in 2024.
العميل
Raydan Food Company
القطاع
Industrial facilities
المدينة
grandmother
النطاق
Food factory in Jeddah Industrial City (Modon)
الحالة
complete
نبذة عن المشروع
Raydan Food Factory - Jeddah
النطاق المنفّذ
Surfaces that can withstand heavy equipment
Ventilation and air conditioning for production and storage areas
Electrical system with backup generators
Insulation for heat and moisture control
Cooling and storage systems
Water and sanitation network
Production, packaging and distribution areas
Fire alarm and extinguishing systems
أبرز مراحل التنفيذ
Layout and surfaces
Distribution of facilities according to the requirements of machine manufacturers, and implementation of surfaces that can support heavy equipment.
Ventilation and electricity
Ventilation and air conditioning for production and storage areas, and electrical system with backup generators.
Cooling and insulation
Insulating materials for temperature and humidity control, and cooling and storage systems for raw materials and products.
Water and safety
Water and drainage network, equipping production, packaging and distribution areas, and firefighting systems.
الجودة والاختبارات
Testing the fire network and water pressure
Checking the thermal insulation of cold rooms
Testing electrical panels and carrying loads
Check ventilation and air ducts
Testing of loading doors and ramps